NGP recoated eight box coolers onboard Bourbon Liberty 308 at Astivik Shipyard. Despite logistic setbacks, the project was completed on time with high-pressure prep and two-coat flooding.

Location:
Astivik Shipyard, Cartagena (Curacao)
Client:
Bourbon Gulf W.L.L.
Vessel:
Bourbon Liberty 308
Type of work:
Recoating of box coolers
From date:
24.10.2024
To date:
04.11.2024
Project summary
Originally scoped for three box coolers, the project was expanded to include all eight units from Bourbon Liberty 308. NGP was responsible for cleaning, prepping, coating and final inspection — all performed on-site under challenging logistics and tight deadlines.
How we worked
Coolers were high-pressure washed (300 bar), manually scraped and flushed to remove failing paint and marine growth. A damaged cooler (15 plugged tubes) was restored and reinstalled. Coating was applied via flooding method with two layers of Säkatonit Extra AR-F and cured in ambient conditions. All tubesheets were ground and finished before delivery.
Results
All eight coolers were recoated to extend service life by an estimated five years.
What we used
- Säkatonit Extra AR-F (2-coat flood method)
- High-pressure water (300 bar)
- Manual scraping tools
- Grinding pads for tubesheets
- Touch-up and inspection protocols
Reflections
This job demonstrates NGP’s flexibility and focus under pressure. By adapting methodology and pushing forward with available resources, we ensured delivery without compromising quality.