---
type: "ArticlePage"
title: "Singapore workshop strengthens regional operations"
canonical: "https://www.nordicgreenproducts.com/news/singapore-workshop-strengthens-regional-operations/"
markdown: "https://www.nordicgreenproducts.com/news/singapore-workshop-strengthens-regional-operations.md"
site: "https://www.nordicgreenproducts.com"
published: "2025-09-23"
modified: "2025-09-24"
authors: ["Nordic Green Products AS"]
---
# Singapore workshop strengthens regional operations

[Home](https://www.nordicgreenproducts.com/) › [News](https://www.nordicgreenproducts.com/news/)

By Nordic Green Products AS — 2025-09-23

One of the first major projects supported from Singapore was the [full recoating of 17 box coolers onboard *Bahtera Azalea* in Batam](https://www.nordicgreenproducts.com/references/bahtera-azalea-full-recoating-of-box-coolers/). Having the right chemicals and coating systems in place when needed was critical to keeping the job moving. This allowed our team to complete cleaning, sandblasting and painting within the planned timeframe .

In Singapore, the base also enabled a [freshwater tank cleaning onboard *SEA1 Sapphire*](https://www.nordicgreenproducts.com/references/freshwater-tank-cleaning-sea1-sapphire/). The job required careful handling and the use of environmentally friendly products to secure safe tank conditions. Quick access to equipment and materials from the warehouse meant minimal waiting time and efficient use of resources.

At a shipyard in Singapore, we carried out in-situ cleaning of 16 box coolers where docking time was limited. The Singapore workshop provided detergents, high-pressure equipment and other supplies that made it possible to perform chemical cleaning directly onboard. This reduced the risk of fouling transfer and ensured the job was completed within the short timeframe .

These projects show how our Singapore base has already strengthened our operations. Looking ahead, it will continue to serve as a hub for efficient and flexible service in the region, ensuring reliable and environmentally sound solutions for shipowners and yards.

## Workshop SG & surrounding jobs

- ![Sea1 Amethyst with Marine Fluid and equipment for In-Situ Cleaning.](https://media.nordicgreenproducts.com/images/sea1-amethyst-marine-fluid.width-1200.format-webp.webp)
- ![Inspection of box coolers on Sea1 Amethyst](https://media.nordicgreenproducts.com/images/sea1-amethyst-box-cooler-in-situ.width-1200.format-webp.webp)
- ![NGPs workshop in Singapore](https://media.nordicgreenproducts.com/images/workshop-in-singapore-with-coate.width-1200.format-webp.webp)
- ![Overview of box coolers after dismantling and HP washing](https://media.nordicgreenproducts.com/images/overview-of-box-coolers-before-c.width-1200.format-webp.webp)
- ![After cleaning on Sapphire, FW tanks](https://media.nordicgreenproducts.com/images/Bilde3.width-1200.format-webp.webp)

## More articles

- [NGP re-certified as Eco-Lighthouse](https://www.nordicgreenproducts.com/news/ngp-re-certified-as-eco-lighthouse/)
- [IMO 2026 explained: what shipowners need to know about firefighting foam](https://www.nordicgreenproducts.com/news/imo-2026-firefighting-foam-requirements-explained/)
- [DHL Shipping Available in Checkout](https://www.nordicgreenproducts.com/news/dhl-shipping-available-in-checkout/)
- [PFAS free firefighting foam does not mean a PFAS free system](https://www.nordicgreenproducts.com/news/pfas-free-foam-vs-pfas-free-systems-explained/)
- [Technical Training and Team Building in the Netherlands](https://www.nordicgreenproducts.com/news/technical-training-and-team-building-in-the-netherlands/)
- [NGP Completes QC Review at A.I.M. Chemicals in Singapore](https://www.nordicgreenproducts.com/news/ngp-completes-qc-review-at-aim-chemicals-in-singapore/)
- [The IMO PFOS Ban Is Now in Effect. Are Your Fire & Safety Systems Compliant?](https://www.nordicgreenproducts.com/news/are-your-fire-safety-systems-compliant/)
- [IMO PFAS Compliance for Firefighting Foam from 2026](https://www.nordicgreenproducts.com/news/pfas-pfos-and-pfoa-in-relation-to-imosolas-requirements-effective-from-1-january-2026/)
- [2025 A Year of Progress](https://www.nordicgreenproducts.com/news/2025-a-year-of-progress/) — A year in review covering service delivery, team growth, new partnerships, global industry presence and continued focus on compliant, practical solutions
- [PFAS / PFOS Firefighting Foam Prohibited from 2026](https://www.nordicgreenproducts.com/news/the-imo-pfas-pfos-ban-takes-effect-in-2026/) — SOLAS amendments under IMO MSC.532(107) prohibit PFOS firefighting foam from 2026. Compliance is required at the first survey on or after entry into force.
